U1
The part being placedParts already on their lanesFeed rods from pins, and rods on to the barsA controller with six pins on one side, run through the arrangement. Each passive stands on the row of the pin it serves, so its feed rod runs straight. Pull-ups to the rail are filled from the top pin down and pull-downs to ground from the bottom pin up; each new part takes the first lane where its rods clear every part already standing, which is why the parts form a staircase. The series resistor keeps the connector it feeds on the same row.